Case Study:Garstang, WWTW

Garstang, WWTW

  • Oct 2012 to April 2013
  • Value: £550,000
  • Client:KMI
  • Garstang

Scheme

Upgrading of existing WWTW.

Scope of works

JMK undertook deep drainage works on a live WWTW .

We laid 525mm and 675mm diameter concrete and 500mm ductile pipes up to depths of 6 metres in challenging ground conditions.

We also constructed various chambers including flowmeters.

Overpumping of WWTW inlet chambers was also required.

JMK also coordinated works to minimise disruption to treatment plant to ensure it remained live at all times.